Search form control

96 results

  • Nursery Inspection / Plant Dealer / Plant Broker License

    Distributed by Department of Agriculture

    Nurseries, Plant Dealers and Plant Brokers must be licensed in the state of Maryland. There are five designations:  NIC (Nursery Inspection Certificate), PDL (Plant Dealer License), PDHL (Plant Dealer Holding License), PBL (Plant Broker License), and PDGL (Plant Dealer Garden License ).

    View Details
    • Valid from approval date for
    • - approval
    • $100.00
  • Child Placement Agency License

    Distributed by Department of Human Resources

    The Office of Licensing and Monitoring within the Department of Human Services approves and licenses child placement agencies (CPA) as out-of-home care providers entrusted with the safety and well-being of the children in their care, ages birth to 20 years of age.  This includes treatment foster care (TFC), independent living programs (ILP), and adoption agencies in the state of Maryland. 

    View Details
    • Valid from approval date for
    • - approval
    • $0.00
  • Natural Wood Waste Recycling Facility Permit

    Distributed by Maryland Department of Environment

    Maryland permit which assures the proper management and recycling of natural wood wastes such as tree stumps, brush and limbs, root mats, logs, leaves, grass clippings, unadulterated wood wastes, and other natural vegetative materials that are generated when land is cleared for construction purposes. The permit is required for those persons who construct and operate natural wood waste recycling facilities in the State of Maryland.

    View Details
    • Valid from approval date for
    • - approval
    • $0.00
  • New Source Review - Air Emission Source

    Distributed by Maryland Department of Environment

    Portions of Maryland have been designated as ozone non-attainment areas, which means that ozone levels in the ambient air occasionally exceed federal air quality standards. Air is considered unhealthful to breathe when federal air quality standards are exceeded. Therefore, any new major stationary source that will discharge significant amounts of volatile organic compounds (VOCs), oxides of nitrogen (NOx) or fine particulate matter (PM – 2.5) must obtain a New Source Review (NSR) approval prior to construction.

    View Details
    • Valid from approval date for
    • - approval
    • $20,200.00
  • Waterway and 100-Year Floodplain (Non-Tidal Wetlands and Waterway Permit)

    Distributed by Maryland Department of Environment

    Waterway construction regulations assure that activities in a waterway or its floodplain do not create flooding on upstream or downstream property, maintain fish habitat and migration, and protect waterways from erosion. Authorization is required for construction or repair of the following projects in a waterway or a 100-year floodplain: Dams and reservoirs, bridges and culverts, excavation, filling or construction, channelization, changing the course, current or cross-section of any stream, temporary construction (e.g. utility lines) or any other similar project. Ponds and dams require a separate review.

    View Details
    • Valid from approval date for
    • - approval
    • $500.00