Search form control

Organizational

57 results (1 Form and 56 Licenses)

Page 12 of 12

  • Waterway and 100-Year Floodplain (Non-Tidal Wetlands and Waterway Permit)

    Distributed by Maryland Department of Environment

    Waterway construction regulations assure that activities in a waterway or its floodplain do not create flooding on upstream or downstream property, maintain fish habitat and migration, and protect waterways from erosion. Authorization is required for construction or repair of the following projects in a waterway or a 100-year floodplain: Dams and reservoirs, bridges and culverts, excavation, filling or construction, channelization, changing the course, current or cross-section of any stream, temporary construction (e.g. utility lines) or any other similar project. Ponds and dams require a separate review.

    View Details
    • approval
    • $500.00
  • Zebra Mussel Free Certification

    Distributed by Department of Natural Resources

    Persons selling live bait that is used in Liberty, Prettyboy or Loch Raven reservoirs must obtain bait that is certified free of zebra mussels or larvae, to prevent the spread of this invasive species in Maryland waters.

    View Details
    • N/A
    • $0.00


Page 12 of 12