Search form control

68 results

  • Lead Paint Training And Instructor

    Distributed by Maryland Department of Environment

    Providers of training for persons involved in the abatement of lead paint must employ instructors and conduct training courses that are accredited by the Department.

    View Details
    • Valid from approval date for
    • - approval
    • $300.00
  • Controlled Hazardous Substance Hauler, Vehicle And Driver Certification

    Distributed by Maryland Department of Environment

    To ensure the safe transport of hazardous wastes within the State of Maryland, the Department regulates the movements of controlled hazardous substances (CHS) by certifying CHS haulers, vehicles, and Maryland-domiciled drivers. 

    View Details
    • Valid from approval date for
    • - approval
    • $20.0 - $50.0
  • Controlled Hazardous Substances Facility Permit

    Distributed by Maryland Department of Environment

    The Controlled Hazardous Substance (CHS) Facility permit is required for the construction and operation of a facility used to treat, store, or dispose of hazardous waste in the state of Maryland.

    View Details
    • Valid from approval date for
    • - approval
    • $12,000.0 - $65,000.0
  • Industrial Wastewater/Stormwater General Discharge Permit From Mining Operations

    Distributed by Maryland Department of Environment

    The general permits for industrial wastewater discharge increase the efficiency of the Department’s permitting process through the issuance of generic permits to categories of business activities which are generally very similar in their wastewater characteristics.

    View Details
    • Valid from approval date for
    • - approval
    • $0.0 - $5,000.0
  • Certificate Of Public Convenience And Necessity (Public Service Commission)

    Distributed by Maryland Department of Environment

    Anyone constructing an electric generating station in the state of Maryland, including emergency back-up power, must apply for and obtain a Certificate of Public Convenience and Necessity (CPCN) from the Public Service Commission (PSC) for larger power generation projects or a CPCN Waiver from the Public Service Commission for smaller power generation projects which meet certain applicability thresholds established by the PSC.

    View Details
    • Valid from approval date for
    • - approval
    • $500.00