Search form control

68 results

  • Asbestos Training Provider

    Distributed by Maryland Department of Environment

    The purpose of these approval procedures is to ensure that the persons requiring asbestos training receive training that meets certain standards set by the State of Maryland. To become a Maryland Approved Training Provider, you must apply for approval of your course.  

    View Details
    • approval
    • $500.00
  • Radiation Machine Facility Registration

    Distributed by Maryland Department of Environment

    This registration ensures that each x-ray tube and the facility in which it is used are registered with the State of Maryland.

    View Details
    • approval
    • $80.0 - $899.0
  • Waterway and 100-Year Floodplain (Non-Tidal Wetlands and Waterway Permit)

    Distributed by Maryland Department of Environment

    Waterway construction regulations assure that activities in a waterway or its floodplain do not create flooding on upstream or downstream property, maintain fish habitat and migration, and protect waterways from erosion. Authorization is required for construction or repair of the following projects in a waterway or a 100-year floodplain: Dams and reservoirs, bridges and culverts, excavation, filling or construction, channelization, changing the course, current or cross-section of any stream, temporary construction (e.g. utility lines) or any other similar project. Ponds and dams require a separate review.

    View Details
    • approval
    • $500.00
  • Tidal Wetland License

    Distributed by Maryland Department of Environment

    The goal of the tidal wetlands program is to manage tidal wetlands to provide reasonable use while furnishing essential resource protection in the State of Maryland. 

    View Details
    • approval
    • $500.00
  • Prevention of Significant Deterioration

    Distributed by Maryland Department of Environment

    To prevent significant deterioration of ambient air quality, the Prevention of Significant Deterioration (PSD) approval seeks to limit the amount of air pollutants released by a new or modified facility proposing to locate in an area that meets national ambient air quality standards (NAAQS). 

    View Details
    • approval
    • $20,200.00