Maryland Department of Environment licenses

68 Licenses

Well Driller License

Distributed by Maryland Department of Environment

A well driller license is required if you: (1) intend to make a hole into the ground for the purpose of either transferring water or heat to or from the ground, or obtaining aquifer data; or (2) intend to install or repair any equipment that is necessary to draw or purify water from a cased borehole. Maryland license issued by Department of Environment. 


Valid for Up to 2 years Last revised : No Date
6 months Approval time
$50-$150 Application cost
15-20 mins Average completion time

Well Construction Permit

Distributed by Maryland Department of Environment

A well construction permit is required for any well that is constructed in the state of Maryland and before installing any well that will explore for water, obtain or monitor ground water, or inject water into any underground formation from which ground water may be produced.


Valid for 1 year Last revised : No Date
30 days Approval time
$160 Application cost
15-20 mins Average completion time

Waterworks and Waste System Operator Certification

Distributed by Maryland Department of Environment

This state of Maryland certification helps to protect public health and the environment by setting minimum education, experience, and examination standards that applicants must satisfy. 


Valid for up to 3 years Last revised : No Date
45 days Approval time
$50-$100 Application cost
15-20 mins Average completion time

Waterway and 100-Year Floodplain (Non-Tidal Wetlands and Waterway Permit)

Distributed by Maryland Department of Environment

Waterway construction regulations assure that activities in a waterway or its floodplain do not create flooding on upstream or downstream property, maintain fish habitat and migration, and protect waterways from erosion. Authorization is required for construction or repair of the following projects in a waterway or a 100-year floodplain: Dams and reservoirs, bridges and culverts, excavation, filling or construction, channelization, changing the course, current or cross-section of any stream, temporary construction (e.g. utility lines) or any other similar project. Ponds and dams require a separate review.


Valid for Up to 5 years Last revised : No Date
9 months Approval time
$500 Application cost
20-30 mins Average completion time

Water and Sewerage Construction Permit

Distributed by Maryland Department of Environment

Water and sewerage construction permits are required by the Maryland Department of Environment before installing, extending or modifying community water supply and/or sewerage systems including treatment plants, pumping stations and major water mains and sanitary sewers.


Valid for One time use Last revised : No Date
3 months Approval time
$125-$2,000 Application cost
15-20 mins Average completion time